PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Electrical roughing at Stairs -5 (2nd Floor) Faicng East (800x600).jpg Installing Stairs -2 (3rd Floor) Facing South (800x600).jpg Metal decking at Roofing Facing North-West (800x600).jpg Continued laying out gravel at the Monumental stairs Facing East (800x600).jpg Installed metal decking at the lower roof Facing South (800x600).jpg Laying out gravel at the Main Loby (102) Facing South (800x600).jpg Metal decking at Roof Facing West (800x600).jpg Started installing couplers at (2nd Floor) along column 7 between J-M Facing North (800x600).jpg Welded embed at the pour stop Facing West (800x600).jpg
Previous pageNext page Installed metal decking at the lower roof Facing South (800x600)
Installed metal decking at the lower roof Facing South (800x600)